Productivity Factors Influencing the Construction of Water Treatment Plants in Egypt (Measurement and Improvement)
Hossam Abu Hantash Abd El Mageed;
Abstract
This research work aimed at designing a model for predicting construction productivity rates in water treatment plants for similar projects in the future.
An investigation was made for collecting information about the most important and effective facto
An investigation was made for collecting information about the most important and effective facto
Other data
| Title | Productivity Factors Influencing the Construction of Water Treatment Plants in Egypt (Measurement and Improvement) | Authors | Hossam Abu Hantash Abd El Mageed | Keywords | Productivity Factors Influencing the Construction of Water Treatment Plants in Egypt (Measurement and Improvement) | Issue Date | 2012 | Description | This research work aimed at designing a model for predicting construction productivity rates in water treatment plants for similar projects in the future. An investigation was made for collecting information about the most important and effective facto |
Attached Files
| File | Size | Format | |
|---|---|---|---|
| 111026p6324.pdf | 184.23 kB | Adobe PDF | View/Open |
Similar Items from Core Recommender Database
Items in Ain Shams Scholar are protected by copyright, with all rights reserved, unless otherwise indicated.