Productivity Factors Influencing the Construction of Water Treatment Plants in Egypt (Measurement and Improvement)

Hossam Abu Hantash Abd El Mageed;

Abstract


This research work aimed at designing a model for predicting construction productivity rates in water treatment plants for similar projects in the future.
 An investigation was made for collecting information about the most important and effective facto


Other data

Title Productivity Factors Influencing the Construction of Water Treatment Plants in Egypt (Measurement and Improvement)
Authors Hossam Abu Hantash Abd El Mageed
Keywords Productivity Factors Influencing the Construction of Water Treatment Plants in Egypt (Measurement and Improvement)
Issue Date 2012
Description 
This research work aimed at designing a model for predicting construction productivity rates in water treatment plants for similar projects in the future.
 An investigation was made for collecting information about the most important and effective facto

Attached Files

File SizeFormat
111026p6324.pdf184.23 kBAdobe PDFView/Open
Recommend this item

Similar Items from Core Recommender Database

Google ScholarTM

Check

views 1 in Shams Scholar
downloads 4 in Shams Scholar


Items in Ain Shams Scholar are protected by copyright, with all rights reserved, unless otherwise indicated.