EVALUATION OF ALEXANDRIA WASTEWATER TREATMENT SYSTEM

Helaly Abdel Hady Helaly;

Abstract


This study was earned out to evaluate the current efficiencies of the different Alexandria General Organization for Sanitary Drainage (AGOSD) treatment facilities.

The Alexandria wastewater system began operation in 1993 as a Phase I of the Alexandria wastewater project. The system constructed under phase Iincludes 211km of collectors, six pump stations, two pnmary treatment plants, and sludge dewatering and disposal facilities.


Other data

Title EVALUATION OF ALEXANDRIA WASTEWATER TREATMENT SYSTEM
Other Titles تقويم نظام معالجة المخلفات السائلة لمدينة الاسكندرية
Authors Helaly Abdel Hady Helaly
Issue Date 2002