EVALUATION OF ALEXANDRIA WASTEWATER TREATMENT SYSTEM
Helaly Abdel Hady Helaly;
Abstract
This study was earned out to evaluate the current efficiencies of the different Alexandria General Organization for Sanitary Drainage (AGOSD) treatment facilities.
The Alexandria wastewater system began operation in 1993 as a Phase I of the Alexandria wastewater project. The system constructed under phase Iincludes 211km of collectors, six pump stations, two pnmary treatment plants, and sludge dewatering and disposal facilities.
The Alexandria wastewater system began operation in 1993 as a Phase I of the Alexandria wastewater project. The system constructed under phase Iincludes 211km of collectors, six pump stations, two pnmary treatment plants, and sludge dewatering and disposal facilities.
Other data
| Title | EVALUATION OF ALEXANDRIA WASTEWATER TREATMENT SYSTEM | Other Titles | تقويم نظام معالجة المخلفات السائلة لمدينة الاسكندرية | Authors | Helaly Abdel Hady Helaly | Issue Date | 2002 |
Recommend this item
Similar Items from Core Recommender Database
Items in Ain Shams Scholar are protected by copyright, with all rights reserved, unless otherwise indicated.