BENCHMARKING THE PERFORMANCE OF EGYPT’S CONSTRUCTION INDUSTRY USING KEY PERFORMANCE INDICATORS

Ahmed Bahaaeldin Ibrahim Ghonamy;

Abstract


ABSTRACT

Construction contractors works in Egypt need to find a unique tool to measure project management performance. This tool is very important to improve contractors’ effectiveness. Key performance indicators (KPI) and Benchmark techniques can be the requested tool to evaluate such effectiveness of construction project management performance in Egypt. A framework is established to select and calculate KPIs values. One hundred and sixty two engineers participated in a Questionnaire to select main six KPIs that affect construction projects in Egypt. The selected factors are 1) cost performance, 2) construction time performance, 3) quality management, 4) safety management, 5) cash flow indicators and 6) customer satisfaction on product. Weighting System using Analytic Hierarchy Process method is implemented to set relative weight between selected KPI by using face to face sessions. Brain storming sessions are used with directors in construction companies to select a method of calculation for each factor. The main outputs are generation of equation for each KPI related to Egyptian market, especially for quality management and cash flow indicators. Three tier one construction companies are selected to share their projects data to calculate their project management performance, KPIs equations are calculated for each project then for each company to develop individual KPIs for each company then create benchmarking for the construction projects in Egypt. Produce predictive analytics modulus using Artificial Neural Networks (ANN) and Linear Regression (LR) are used to calculate time performance of construction projects, thirty projects used in training process and ten projects used in testing process. ANN model error or accuracy was 3.8% in training process and 6.6% in testing process and LR model errors or accuracy is 5.6% in training process and 5.6% in testing process. Both algorithms have testing error less than 7% which yielded acceptable results for ANN and LR models, however LR is recommended than ANN because testing error is 5.6% while in ANN testing error is 6.6%. Research outputs and results are very essential for construction companies to improve their performance, and compare their performance to other companies work in Egypt. Also it is genuine method for decision makers and investors to estimate correctly their project performance.


Other data

Title BENCHMARKING THE PERFORMANCE OF EGYPT’S CONSTRUCTION INDUSTRY USING KEY PERFORMANCE INDICATORS
Other Titles مؤشر ألاداء لصناعة التشييد فى مصر باستخدام مقاييس الأداء الرئيسية
Authors Ahmed Bahaaeldin Ibrahim Ghonamy
Issue Date 2018

Attached Files

File SizeFormat
J9382.pdf172.62 kBAdobe PDFView/Open
Recommend this item

Similar Items from Core Recommender Database

Google ScholarTM

Check

views 2 in Shams Scholar
downloads 4 in Shams Scholar


Items in Ain Shams Scholar are protected by copyright, with all rights reserved, unless otherwise indicated.