For many contractors and builders in Egypt, as well as in many other developing countries, the issue of the construction waste is still recent and limited in the cost of waste and cost of disposals. As a mater of fact, the construction waste issue has many different aspects beside cost of waste and disposals. For example, using materials in an efficient way is becoming a new issue because of insufficient sources of natural materials, and the
energy needed to create and assemble the products and materials. Without any doubt the
environment issue including illegal dumping, landfills, pollution from contaminated soils,
hydraulic liquids from construction equipment, and many other issues is now highlighted. In fact, construction Industry in Egypt needs to find a suitable solution regarding construction waste problem. The required solution has to be adequate to construction industry environment in Egypt, since it is a national problem. One of the important steps to achieve the solution is the estimation of the waste quantities. This study proposes a
decision support system to estimate the quantity of waste for the most widely used construction materials. The proposed system is employs Fuzzy logic and depends on the experts' opinion. The system is also display the general average of the waste percentage for the assigned construction material as a market refrence.The proposed system adopts the project environment through estimating the values of mistakes in the different factors
that affect waste quantities. These values are estimated through the project characteristics. In order to develop the proposed model, a data collected from 58 construction companies has been used. An assessment of the current practices from the Egyptian construction companies regarding construction waste, identifying the factors that affect the waste generating, the project characteristics that lead to estimate the mistakes in these factors, and the effect of each factor on the different construction materials is investigated. To validate the results estimated from the proposed model, a comparison through a statistical analysis between the actual waste quantity resulted from a real 30 construction projects and these resulted from the model has been performed. The results of this statistical analysis show that the model is accepted.


Other data

Title ESTIMATING AND MANAGING CONSTRUCTION WASTE IN THE EGYPTIAN CONSTRUCTION INDUSTRY
Other Titles تقدير وادارة مخلفات الانشاءات فى صناعة التشييد المصرية
Authors ATEF ABD EL MOGHNY RAGAB
Issue Date 2005

Attached Files

File SizeFormat
B12881.pdf960.81 kBAdobe PDFView/Open
Recommend this item

Similar Items from Core Recommender Database

Google ScholarTM

Check

views 4 in Shams Scholar


Items in Ain Shams Scholar are protected by copyright, with all rights reserved, unless otherwise indicated.