CONTRACTOR'S RISKS IN LUMP-SUM DESIGN/BUILD CONTRACTS
MOHAMED YEHLA HELMI RAGAB;
Abstract
From the Unstructured Interview with the respondents it is found that Lump-Sum Dc.signii3uild Contracts are the most favorable contracts to the owner, particularly in public sector, due to tilt: decrease in the amount of risks allocated to the owner, shortened project delivery time and single point of responsibility for both design and construction. in this type of con.traels the Contractor (1)esign 1 Builder) is facing many risks and re6porisibilir..ies that are not present traditional contracts (Design/Bid/Build). Those risks should be taken into account during the Tendering Stage, the Design Stage, the Construction Stage, and the Commissioning Stage.
Other data
| Title | CONTRACTOR'S RISKS IN LUMP-SUM DESIGN/BUILD CONTRACTS | Other Titles | مخاطر المقاول فى عقود التصميم والتنفيذ ثابته القيمه الماليه | Authors | MOHAMED YEHLA HELMI RAGAB | Issue Date | 2003 |
Attached Files
| File | Size | Format | |
|---|---|---|---|
| B18425.pdf | 271.62 kB | Adobe PDF | View/Open |
Similar Items from Core Recommender Database
Items in Ain Shams Scholar are protected by copyright, with all rights reserved, unless otherwise indicated.