PROPOSED PROBABILSTIC MODEL FOR PREDICTING THE LOWEST BID IN EGYPTIAN CONSTRUCTION PROJECTS
AMR METWALY EL -SAYER EL KHOLY;
Abstract
Competitive bidding is the major nightmare for contractors because most of their life's blood depends on it It is an intriguing and critical activity of management. It appears -L.,o defy analysis and cloaked with a certain amount of uncertainties, This is because direct cost estimating of construction is 2 complex and crude. process due to the absence of standardization of conditions from one job to the other. Also, the inherently complex factors ofiabor, material and locality make the computation of exact construction costs a matter of accident than of desiRn, Subcontractor's quotation is another factor which affect direct cost estimating. On the other hand, indirect cost and markup estimating depend on a large number of factors such as total number of competitors the contractor
pping to compete with and size of the project. In addition, mos( oF the contractors liave.noL 2-; systematic approach cif bidding
pping to compete with and size of the project. In addition, mos( oF the contractors liave.noL 2-; systematic approach cif bidding
Other data
| Title | PROPOSED PROBABILSTIC MODEL FOR PREDICTING THE LOWEST BID IN EGYPTIAN CONSTRUCTION PROJECTS | Other Titles | نموذج احتمالى مقترح للتنبؤ بقيمه العطاء الاقل فى مشروعات التشييد بمصر | Authors | AMR METWALY EL -SAYER EL KHOLY | Issue Date | 2003 |
Attached Files
| File | Size | Format | |
|---|---|---|---|
| B18427.pdf | 374.2 kB | Adobe PDF | View/Open |
Similar Items from Core Recommender Database
Items in Ain Shams Scholar are protected by copyright, with all rights reserved, unless otherwise indicated.