INCREASING TRANSMITTED POWER WITH COST MITIGATION VIA MODIFIED EHV POWER LINES IN EGYPTIAN GRID
Ahmed Taleb Mohamed Mohamed Shebl;
Abstract
Our thesis introduces suggested solutions and alternatives for increasing the transmis- sion capacity of the existing lines with the optimum cost. This requires to evaluate the electric field profiles between and closed to submitted hybrid and HVDC power lines in Egyptian grid and the cost of the different proposed alternatives. Four alternatives will be patterned and modeled. Numerical technique will be applied to estimate the field profiles beside and among the presented lines. The technique is the charge simulation method (CSM) for electric field estimation. The simulations and analysis will be per- formed using a computer program performed by attractive packages such as MATLAB.
Other data
| Title | INCREASING TRANSMITTED POWER WITH COST MITIGATION VIA MODIFIED EHV POWER LINES IN EGYPTIAN GRID | Other Titles | زيادة القدرة المنقولة بتكلفة أقل باستخدام خط جهد فائق معدل في شبكة الكهرباء المصرية | Authors | Ahmed Taleb Mohamed Mohamed Shebl | Issue Date | 2022 |
Attached Files
| File | Size | Format | |
|---|---|---|---|
| BB12996.pdf | 479.39 kB | Adobe PDF | View/Open |
Similar Items from Core Recommender Database
Items in Ain Shams Scholar are protected by copyright, with all rights reserved, unless otherwise indicated.