THE EFFICIENCY OF USING DIFFERENT CONSTRUCTION DELIVERY METHODS AGAINEST TRADITIONAL DELIVERY METHOD (DESIGN-BID-BUILD) IN EGYPT
Mohamed Shaker Sheha;
Abstract
ABSTRACT
Construction delivery methods have evolved through the last decades due to the growing need of using a more suitable method for the project than the traditional delivery method (Design-Bid-Build), in which the construction begins after the comple
Construction delivery methods have evolved through the last decades due to the growing need of using a more suitable method for the project than the traditional delivery method (Design-Bid-Build), in which the construction begins after the comple
Other data
| Title | THE EFFICIENCY OF USING DIFFERENT CONSTRUCTION DELIVERY METHODS AGAINEST TRADITIONAL DELIVERY METHOD (DESIGN-BID-BUILD) IN EGYPT | Other Titles | فعالية استخدام الطرق التعاقدية المختلفة عن الطريقة التقليدية ( التصميم – المناقصة – التنفيذ ) داخل مصر | Authors | Mohamed Shaker Sheha | Keywords | THE EFFICIENCY OF USING DIFFERENT CONSTRUCTION DELIVERY METHODS AGAINEST TRADITIONAL DELIVERY METHOD (DESIGN-BID-BUILD) IN EGYPT | Issue Date | 2011 | Description | ABSTRACT Construction delivery methods have evolved through the last decades due to the growing need of using a more suitable method for the project than the traditional delivery method (Design-Bid-Build), in which the construction begins after the comple |
Recommend this item
Similar Items from Core Recommender Database
Items in Ain Shams Scholar are protected by copyright, with all rights reserved, unless otherwise indicated.