MODELING THE AS-BUILT CRITICAL PATH FOR DELAY ANALYSIS
RANA NABIL KHALLAF;
Abstract
6.1 SUMMARY
In this research, a set of equations has been introduced in order to calculate the as-built critical path. The study introduced a set of equations derived from the basic principles of scheduling and through trials on projects to generate the
In this research, a set of equations has been introduced in order to calculate the as-built critical path. The study introduced a set of equations derived from the basic principles of scheduling and through trials on projects to generate the
Other data
Title | MODELING THE AS-BUILT CRITICAL PATH FOR DELAY ANALYSIS | Other Titles | نمذجة المسار الحرج الفعلي لتحليل التأخيرات في المشاريع | Authors | RANA NABIL KHALLAF | Keywords | MODELING THE AS-BUILT CRITICAL PATH FOR DELAY ANALYSIS | Issue Date | 2013 | Description | 6.1 SUMMARY In this research, a set of equations has been introduced in order to calculate the as-built critical path. The study introduced a set of equations derived from the basic principles of scheduling and through trials on projects to generate the |
Attached Files
File | Size | Format | |
---|---|---|---|
114606Modeling the As-Built Critical Path.pdf | 179.37 kB | Adobe PDF | View/Open |
Similar Items from Core Recommender Database
Items in Ain Shams Scholar are protected by copyright, with all rights reserved, unless otherwise indicated.