Analysis of Tunnels Constructed through Limestone Formations in the Greater Cairo.

Eng. Yasser Hendawy Mohamed Mohamed;

Abstract


The main tunnel of the Greater Cairo East Bank Wastewater Project is the first
constructed tunnel in Cairo through different ground conditions below groundwater table.
Different techniques were used for the construction of different stretches of this tu


Other data

Title Analysis of Tunnels Constructed through Limestone Formations in the Greater Cairo.
Other Titles تحليل الانفاق المنفذة فى تكوينات الحجر الجيرى بالقاهرة الكبرى
Authors Eng. Yasser Hendawy Mohamed Mohamed
Keywords Analysis of Tunnels Constructed through Limestone Formations in the Greater Cairo.
Issue Date 2012
Description 
The main tunnel of the Greater Cairo East Bank Wastewater Project is the first
constructed tunnel in Cairo through different ground conditions below groundwater table.
Different techniques were used for the construction of different stretches of this tu

Attached Files

File SizeFormat
111854p6846.pdf932.41 kBAdobe PDFView/Open
Recommend this item

Similar Items from Core Recommender Database

Google ScholarTM

Check

views 2 in Shams Scholar


Items in Ain Shams Scholar are protected by copyright, with all rights reserved, unless otherwise indicated.