Analysis of Tunnels Constructed through Limestone Formations in the Greater Cairo.
Eng. Yasser Hendawy Mohamed Mohamed;
Abstract
The main tunnel of the Greater Cairo East Bank Wastewater Project is the first
constructed tunnel in Cairo through different ground conditions below groundwater table.
Different techniques were used for the construction of different stretches of this tu
constructed tunnel in Cairo through different ground conditions below groundwater table.
Different techniques were used for the construction of different stretches of this tu
Other data
| Title | Analysis of Tunnels Constructed through Limestone Formations in the Greater Cairo. | Other Titles | تحليل الانفاق المنفذة فى تكوينات الحجر الجيرى بالقاهرة الكبرى | Authors | Eng. Yasser Hendawy Mohamed Mohamed | Keywords | Analysis of Tunnels Constructed through Limestone Formations in the Greater Cairo. | Issue Date | 2012 | Description | The main tunnel of the Greater Cairo East Bank Wastewater Project is the first constructed tunnel in Cairo through different ground conditions below groundwater table. Different techniques were used for the construction of different stretches of this tu |
Attached Files
| File | Size | Format | |
|---|---|---|---|
| 111854p6846.pdf | 932.41 kB | Adobe PDF | View/Open |
Similar Items from Core Recommender Database
Items in Ain Shams Scholar are protected by copyright, with all rights reserved, unless otherwise indicated.