Modeling and optimizing linear projects using LSM and Non-dominated Sorting Genetic Algorithm (NSGA-II)

Altanany, M. Yasser; Badawy, Mohamed; Ebrahim, Gamal A.; Ehab, A.;

Abstract


Linear projects are a special type of repetitive projects. Major disadvantages have been shown when using the critical path method (CPM) for linear project problems. So, to overcome these shortcomings linear scheduling method (LSM) was used to analyze linear projects. There are different types of activities in linear projects. However, existing mathematical models for LSM cannot represent all types of linear project activities. Therefore, this paper presents a mathematical model that can represent all types of activities using matrices. Moreover, the mathematical model is then used to create an optimization model that minimizes the project duration and cost using non-dominated sorting genetic algorithm II (NSGA-II). The two models can help project managers in scheduling real-life linear projects and find optimum linear project schedules. This paper introduces an optimization model for linear projects that utilizes matrices, offering a different approach in the field of linear project optimization.


Other data

Title Modeling and optimizing linear projects using LSM and Non-dominated Sorting Genetic Algorithm (NSGA-II)
Authors Altanany, M. Yasser; Badawy, Mohamed ; Ebrahim, Gamal A.; Ehab, A.
Keywords Linear projects;Linear scheduling method;Optimization;LSM
Issue Date 1-Sep-2024
Journal Automation in Construction 
ISSN 09265805
DOI 10.1016/j.autcon.2024.105567
Scopus ID 2-s2.0-85196221568

Recommend this item

Similar Items from Core Recommender Database

Google ScholarTM

Check



Items in Ain Shams Scholar are protected by copyright, with all rights reserved, unless otherwise indicated.