Modeling and optimizing linear projects using LSM and Non-dominated Sorting Genetic Algorithm (NSGA-II)
Altanany, M. Yasser; Badawy, Mohamed; Ebrahim, Gamal A.; Ehab, A.;
Abstract
Linear projects are a special type of repetitive projects. Major disadvantages have been shown when using the critical path method (CPM) for linear project problems. So, to overcome these shortcomings linear scheduling method (LSM) was used to analyze linear projects. There are different types of activities in linear projects. However, existing mathematical models for LSM cannot represent all types of linear project activities. Therefore, this paper presents a mathematical model that can represent all types of activities using matrices. Moreover, the mathematical model is then used to create an optimization model that minimizes the project duration and cost using non-dominated sorting genetic algorithm II (NSGA-II). The two models can help project managers in scheduling real-life linear projects and find optimum linear project schedules. This paper introduces an optimization model for linear projects that utilizes matrices, offering a different approach in the field of linear project optimization.
Other data
| Title | Modeling and optimizing linear projects using LSM and Non-dominated Sorting Genetic Algorithm (NSGA-II) | Authors | Altanany, M. Yasser; Badawy, Mohamed ; Ebrahim, Gamal A.; Ehab, A. | Keywords | Linear projects;Linear scheduling method;Optimization;LSM | Issue Date | 1-Sep-2024 | Journal | Automation in Construction | ISSN | 09265805 | DOI | 10.1016/j.autcon.2024.105567 | Scopus ID | 2-s2.0-85196221568 | 
Recommend this item
Similar Items from Core Recommender Database
	
	Items in Ain Shams Scholar are protected by copyright, with all rights reserved, unless otherwise indicated.